I have a project where the base point is set at 0'-0" and not the real world elevation. I'm working on some grading in conjunction with the Civil drawings which are in real world elevations. If I move the base point on my model, will it affect the other disciplines which are linked? I can do the grading easily in a separate file but just would like to know, as I assume the answer is "yes, don't mess with it now".

1 ANTWORT 1
Nachricht 2 von 2
barthbradley
als Antwort auf: PhilvK

Project Base Point has nothing to do with Shared Coordinates or Links.  Move the PBP to Timbuktu if you want.  :zwinkerndes_Gesicht:

 

Now, if PBP is the Elevation Base for placed Level Types, Spot Elevation Types, etc., then changing Elevation of the PBP will change their values.  

 

 

 