Hello,
I received a Revit file which contains a main building as a model and many other auxiliary buildings, all of them as Links (Revit links)
I've just notice that when I create a material takeoff schedule, the linked objects, means the auxiliary buildings, will not be considered.
Using the "Highlight in Model" button I couldn't find one single element which relates to the linked objects!
Must I bind the linked objects, or is there something I need/have to do?
Thank you in advance.
Gelöst! Gehe zur Lösung
Gelöst von RDAOU. Gehe zur Lösung
They do if
YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.