Hi,
I have a scheduling error where Revit is not providing the material volume I am expecting. My manual calculations are different than what the schedule is providing.
Im trying to schedule the concrete volume of a precast insulated panel, where we have 3" of concrete, 4" of insulation, and then 3" of concrete. The two concrete wythes need to be scheduled seperately, because there are cases where they are not the same volume. I created two seperate materials for the inside and outside wythe, and filtered the schedule appropriately. From what I can tell, everything is working, just the result is wrong by a little bit.
Ive attached a Revit file with the schedule and wall panels. They are assemblies, and on assembly sheets. Wall 001 seems to schedule okay, but Wall 002 is the one having issues. If anyone could help me find the cause that would be great!
Thanks
Hi
Somehow this part ( Precast Additional ) is affection " Precast Exterior Wythe" Volume which
should not be the case...
Test it.. its withing those two layers and deleting it should not change the volume of Exterior...
but its affecting the volume..