material schedule is calculating ALL surfaces

5 ANTWORTEN 5
GELÖST
Antworten
Nachricht 1 von 6
ryley.g.h
760 Aufrufe, 5 Antworten

material schedule is calculating ALL surfaces

So, I am creating a material take off for wall tiles, and we have a base tile that is a sweep within the wall assembly. In order to calculate the wall base I had to explode the walls into parts, and this is where the issue is happening. When I look at the schedule for the main wall tile (the white wall tile above the selected base in the picture), it calculates fine. However, when I look at the base (6 inches in height), it seems to be calculating every single surface and edge in the area on the schedule. In the pictures, you can see the schedule reads out 10 square feet, but the modelled part is 6" tall by 9'-6" long.

 

9.5'x0.5'=4.75 square feet, not 10 square feet.

 

I'm at a loss of ideas, how do I make it calculate the square area of the base correctly?

 

Revit: 2020.2.5

 

ryleygh_0-1640110942188.pngryleygh_1-1640110959958.png

ryleygh_2-1640111040447.png

 

5 ANTWORTEN 5
Nachricht 2 von 6
barthbradley
als Antwort auf: ryley.g.h

Yes; that's how Revit calculates. Paint the surface and calculate that Material instead.  

Nachricht 3 von 6
RDAOU
als Antwort auf: ryley.g.h

.

YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION


Nachricht 4 von 6
ryley.g.h
als Antwort auf: RDAOU

I ended up figuring out a work around, by adding in the length field I was able to build in a calculated field that would calculate the actual square footage (rounded up to the nearest 1 sqft), that I could then report back to my linear feet field.

 

ryleygh_0-1640116125476.png

 

Nachricht 5 von 6
RDAOU
als Antwort auf: ryley.g.h

@ryley.g.h 

 

It is more practical to use split region to split finish layer and use that for skirting ... this allows you to use the built in thickness/height of the layer in calculations 

 

ie (LxH = Area) and no need for all that 1m long formula :leicht_lächelndes_Gesicht:

 

RDAOU_0-1640117586383.png

 

 

YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION


Nachricht 6 von 6
ryley.g.h
als Antwort auf: RDAOU

Man, wish I knew that before spending all that time on the formula lol!

Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.