-This project is in bim 360.
-One member is still in 2019, while the rest of us are in 2019.2.
-I have audited the file.
-When reloading the link it just doesn't do anything.
-The link says loaded but its not loaded.
-I've seen Autodesk issue/resolution statement on this issue about phase mapping, I'm not familiar with how to work with phase mapping between links.
How can I resolve this to get the link loaded into the model?
No it doesn't show up in the model at all. When I try to edit it in VG it says the link is not loaded, but in manage links it shows its status as loaded.
Yes, but this is a link coordination issue, not really a hidden objects issue.
@ChrisGamble wrote:Yes, but this is a link coordination issue, not really a hidden objects issue.
I don't know why you are making that distinction, but I agree that this could be characterized as a link coordination issue. Keep in mind that I just got here, and I am beginning troubleshooting from scratch - starting with the most obvious. I have no idea what you've tried.
Here's 33 more:
https://www.revitforum.org/tutorials-tips-tricks/441-cant-see-view-heres-33-reasons-maybe-why.html
@ChrisGamble wrote:
Tried that, and then revit experienced an unexpected error.
So obviously something is wrong with the link file. Open it and inspect, re-save, etc..
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.