Levels information does not match Architectural model

4 ANTWORTEN 4
Antworten
Nachricht 1 von 5
Anonymous
1513 Aufrufe, 4 Antworten

Levels information does not match Architectural model

I discovered in our model that our level datums do not match the architecture and structural models.  Our level  is 6" off graphically, but the datum marker text matches the architecture model (98'-7"). 

 

However, if I move our level and model vertically 6", it will match the other model graphically, but the marker level text will read 99'-1".

 

What's the correct way to move our levels if it does not match the architecture model

4 ANTWORTEN 4
Nachricht 2 von 5
ennujozlagam
als Antwort auf: Anonymous

hello, you can use Shared Coordinates. thanks





Remember : without the difficult times in your LIFE, you wouldn't be who you are today. Be grateful for the good and the bad. ANGER doesn't solve anything. It builds nothing, but it can destroy everything...
Please mark this response as "Accept as Solution" if it answers your question. Kudos gladly accepted.
Nachricht 3 von 5
Corsten.Au
als Antwort auf: Anonymous

Hello

 

Datum shows as per

1. Survey point or

2. Project base point..

 

Task A. 

Find out whether " Levels "  are shown as per 1, or 2...

 

Task B.

Align the model and levels... ( seems you have done this ) now to correct the datum you just need

to move Survey point or Project base point ( based on Task A )

Pls note... Survey point and Project base point might need " clipping" or unclipping while moving them..

clip.JPG

 

Ex: level showing 10.00 meters, relative to Project Base Point.. and to make the level 11.00 meters , then you need to move

survey point in opposite direction ( i.e . downwards ) to 1.00 metes. 

Corsten
Building Designer
Nachricht 4 von 5
barthbradley
als Antwort auf: Anonymous

I'm not understanding. So "their" datum's elevation doesn't match yours. So what?  Do the levels line up? Great! 

Nachricht 5 von 5
Corsten.Au
als Antwort auf: Anonymous

Last Line Correction

 

Ex: level showing 10.00 meters, relative to Project Base Point.. and to make the level 11.00 meters , then you need to move Project Base Point.. in opposite direction ( i.e . downwards ) to 1.00 metes. 