Levels from Link models are repeated in wall Schedule for Multi storey residential project

Levels from Link models are repeated in wall Schedule for Multi storey residential project

kketankhoraasia
Observer Observer
618 Views
2 Replies
Message 1 of 3

Levels from Link models are repeated in wall Schedule for Multi storey residential project

kketankhoraasia
Observer
Observer

Hi, I am modeling a multistorey residential project, in which a typical apartment is repeated on residential levels by copying the same link on all levels. When I generate the schedule of the Walls, I see only one level is seen for walls in the link. 

 

Is there a way to link the walls to the main model levels? 

0 Likes
619 Views
2 Replies
Replies (2)
Message 2 of 3

barthbradley
Consultant
Consultant

So, you have multiple instances of the same Link in your Project - each with their own unique name.  Choose a name that identifies which Parent Project Level that the Link is on.  Include RVT Link: Name Parameter Field in Schedule

0 Likes
Message 3 of 3

kketankhoraasia
Observer
Observer

Thank you @barthbradley, This was my alternate solution for scheduling the wall. but I wanted to do that by levels. just to make sure it's modeled correctly and none of the links are placed twice exactly at the same location. 

 

Isnt there any other way to schedule the linked model from the main model levels? 