After developing a design in Revit, I renamed Level 1 and Level 2 to DD First Floor and DD Mezzanine. Then I duplicated these views and named them First Floor Plan and Mezzanine Floor Plan. Then I generated a Room Finish Schedule. The level names are DD First Floor and DD Mezzanine. I want the level names to be First Floor Plan and Mezzanine. How do I do that?
Gelöst! Gehe zur Lösung
Gelöst von ToanDN. Gehe zur Lösung
Gelöst von ToanDN. Gehe zur Lösung
That worked! I had to make sure not to rename the corresponding views because they were the DD plans.
the original levels (the ones synchronized with the elevation levels) were the DD plans, which I wanted to save. They have furniture and room names without room numbers. Then I duplicated those original levels for the working drawings. Although the duplicated views received the room name/number labels, when the room finish schedule was generated, it used the original views.