I copied and pasted a door schedule from another project. I tried to create a key schedule but all the fields listed in the door schedule are not listed as available in the Key schedule. Does this have something to do with the copy / paste, or should I check something else as the likely problem?
If I have to start from scratch, will purging get rid of the 'old' door fields? Thanks!