Message 1 of 5
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have three bits of terrain: the first being the base topography or the pre-project landscape, the second everything that needs to be added to the existing landscape and the third showing what needs to be removed from the existing situation to allow the project to be built. While I seem to be able to subtract one toposolid from another or add one, there is no way to xor a toposolid or is there? How can this be modelled? I have csv files of the three topographies.
Solved! Go to Solution.