Message 1 of 3
Inserting data rows into schedules and adding revision information
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I'm creating a sheet list that includes subconsultant drawings which are not linked in model. I'm adding them as dumb data rows. Is there a way to add revision information for these fields or do i have to create dummy sheets in order to show a revision date in the schedule?
