I have an engineer that is editing a master site file as the project develops,
I'd like to link his cad file and then generate topography.
When he makes updates to the cad file, would I need to delete my topo and then regenerate from the link?
Should be easy enough, just can't think of another way that would be more automated.
Thhanks