I am working on a door schedule for a project that has multiple half/mezzanine levels. So, when I try to sort the doors according to levels, the levels are automatically sorted based on their names, which is contradictory to their actual elevations. For example, when I choose ascending order for level, "Lobby Floor" is listed in front of "First Floor" on the schedule but it's 2' above the "First Floor". Similarly, "Roof" is in front of "Second Floor", which is misleading. Is there a way to let the sorting of the schedule to recognize the actual elevations of the levels instead of their names?