Hello
Here is my problem: I am modelling a curtain wall and I need to take-off the lenght of each single mullion to be manufactured. However. even if I make a mullion continuos at joints, each segment in the same gridline will still be counted as individual mullion in the schedule. I have a horizontal mullion (continuos at joints) and I cannot take-of the total dimension of it. Does anyone has faced the same as me? How can I solve it?
Note: sorting/grouping by mullion type and then calculating totals would be a solution in general cases, BUT it does not help for the situation that I have.
Thanks all
Gelöst! Gehe zur Lösung
Gelöst von ToanDN. Gehe zur Lösung
There are a couple of ways:
I did not know it was possible to use nested curtain walls. It will attend my needs.
Thank you for your help!!!
For scheduling the lengths of sloped top-edge panels, I thought to schedule the mullions instead. But when I create a single-segment horizontal grid line to make a door or a window, it splits up all the vertical mullions, making the whole scheduling process useless.
Could you please let me know if the second option you proposed would work here?
Thank you.