All the areas, FAR and NON FAR, should be under the same Area Plans and in the same schedule. Use a parameter such as Comments to enter FAR and NON FAR, or create a Y/N parameter checkbox, up to you. Then you can use sorting/grouping/filtering to separate them based on the parameter above.