Message 1 of 4
How to copy drafting view into a different project

Not applicable
02-14-2017
10:12 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
I have some wall details in a drafting view that I am trying to put on a sheet that is in different project. How do I copy those details into the new project without losing or messing up the original file and/or the second project.
Greatly Appreciated
Shawn B