How do you create a space between sheets in a sheet schedule?

5 ANTWORTEN 5
GELÖST
Antworten
Nachricht 1 von 6
djn9SY84
398 Aufrufe, 5 Antworten

How do you create a space between sheets in a sheet schedule?

I want be be able to have a blank row between my sheets when the numbers go up to the next 10. 

 

i have attached an image below. i want to have a blank row between sheet number 06 and 10. 

 

How do you do this?

 

djn9SY84_1-1716510299179.png

 

5 ANTWORTEN 5
Nachricht 2 von 6
eizinmyat
als Antwort auf: djn9SY84

Hello,

 

I attached the link so that you can check how to add blank rows in Sheet Index. I hope it helps.

 

https://forums.autodesk.com/t5/revit-architecture-forum/add-blank-rows-in-sheet-index/td-p/6776523

Please mark this response as "Accept as Solution" if it answers your question. Kudos gladly accepted.

Ei Zin Myat
Technical Sales Unit Engineer
ONESTRUCTION Co., Ltd.
eizinmyat@onestruction.com
Nachricht 3 von 6
barthbradley
als Antwort auf: djn9SY84

Here's one approach:

 

Create a Duplicate, uncheck Show Title and Show Header (Appearance Tab), Filter to limit what Schedule reports (e.g. Sheet Number  - is Greater Than - 08 in your example),  and place this on Sheet under the source Schedule. The source Schedule contains Title and Header and is Filtered to show want isn't shown on the copy Schedule. In your example, the Filter would read: Sheet Number  - is Less Than - 08 .

 

ListCopy.png

Nachricht 4 von 6
azad.Nanva
als Antwort auf: djn9SY84

you can use the sorting and choose the sheet number and check the Blank line:

 

azadNanva_0-1716537915188.pngazadNanva_1-1716537995410.png

 

If it solves your problem, please click Accept to enhance the Forum.
Nachricht 5 von 6
azad.Nanva
als Antwort auf: djn9SY84

if i were i use the new variable like "schedule layout" and give him the value like A,B,C,... or 1,2,3:

 

azadNanva_0-1717065531588.png

give the variable your value:

 

azadNanva_1-1717065659294.png

then you can use the "sort by: schedule layout" and hide the column C like the attached image:

 

azadNanva_2-1717066285787.png

 

and now you have this :

 

azadNanva_3-1717066376274.png

 

 

 

 

If it solves your problem, please click Accept to enhance the Forum.
Nachricht 6 von 6
ToanDN
als Antwort auf: djn9SY84

Just split the schedule and stretch each segments to include 10 sheets.