Message 1 of 1
Help with aligning studs and track
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hello. I am working in Revit 2020 (for a specific project) and I have all my studs placed. I have just placed the track and when I use the align tool, it will align one end where the stud and track ends but then I check the other end and it is not aligned. I went back and made sure the track was placed directly in the middle on the stud before going to the other end and having it snap into place before placing.
Thanks!!!!