Hello everyone,
Maybe someone can help me out. I'm working on a project with multiple models. I'm linking them in and everything is coming over fine. However, the architect has some sort of view template or phase setting that I need to change on my end to show the floors correctly as they assigned. I believe they created a Consultant Background view I should be using, but I can not get them to show properly not matter what I change. What I'm I missing? Do I need to transfer something over from the architects models?
Thanks for the quick reply. I'll try that and let you know how it goes. Much appreciated.
I tried it out and nothing changed. I'm thinking maybe I have the wrong model copy monitored. They have different floors being worked on in the three individual models. Could it be possible that I have to copy monitor just the floors being worked on in each model? I currently just copy monitoring from one model now.
I figured it out with the information you gave me. I was over thinking it and just needed to find the linked view within the model that pertained to the floors I needed changed. It made it difficult to figure out because there are over 30 floors and only certain ones are assigned to one of the three models. Never dealt with a situation like this. Thanks for the help. It was much appreciated.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.