Community
hello guys, I wanted to know if it was possible to extrapolate data from one model to IFC, for example in a schedule.He states that lately I'm working a lot with Tekla Structure Designs for steel, then the data that I would need to provide the count bolts, welds etc. etc ..... amount weights and materials. Thanx all!