Hi all,
We have to prepare an extension of an existing building.
I want to model the existing in order to coordinate easly the connection between both. Probabily there will be some demolitions due to the extension (Mainly in the cladding).
I would like to know If in your opinion it is better to model the exisitng building in a different project and link it into the new project or modelling both in same progect and assign different phasing to specific elements?
The Existing+new construction will involve a surface of around 6000m2.
Solved! Go to Solution.