I made a big mistake: I modded many points on the wrong fase and now I need to copy them on the previous phase. How can I do?
Gelöst! Gehe zur Lösung
Gelöst von cbcarch. Gehe zur Lösung
-Make a copy of the toposurface. ( copy to clipboard.)
-Change the new copy's phase
-Delete the old toposurface
-Paste aligned to view the new toposurface
Not a big mistake, or a mistake at all. Just finish the toposurface and change it to the previous phase.
The problem is that I have edited points on construction phase when I had to edit them on existing phase. Now what I'd like to the is copy some points (not all) from a phase to the other.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.