How do I edit (delete, add) color scheme categories?
At some point I knew how to do it, but forgot.
and it seems the categories also determine what schedules are available. Each category is a different schedule type.
Can someone explain how that being different type of schedules is useful? I don't use area schedules very much. but I like a better strategy to use them and possibly schedule areas.
and it seems only in the view template I can select between these categories. If I just select from the view properties, I only get one category to chose from.
Gelöst! Gehe zur Lösung
Gelöst von ToanDN. Gehe zur Lösung
No, I want to edit the categories. Like in the screenshot in the OP. Many years ago I created an area category called "CODE STORMWATER". But I don't remember how I did that and want to delete/edit/add those categories. So I know it is possible, but how?
It appears whatever categories exist also are available to build a schedule (see the second screenshot in OP)
Go the Rooms Areas drop down menu from the ribbon > Areas and Volume computations > Area Schemes > New to add Area scheme.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.