Message 1 of 5
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi
Is there a way by which I can automatically add a suffix to a drawing number to indicate the revision?
For example, say I have a drawing numbered 'BR23' that has already been issued. I then make revisions, place some 'revision A' revision clouds and want to reissue the drawing. The revision date is automatically changed on the drawing sheet. I also need the drawing number to automatically change to 'BR23A'. At the moment I have to go through manually and edit these. It's time consuming and easy to miss a sheet potentially causing problems later on.
Thank you 🐵
Solved! Go to Solution.