I would like to have the following order for my drawing index:
1.) Architectural
2.) Structural
3.) Mechanical
4.) Electrical
How do I make this happen?
Please see the attachment for my sheet list properties setting. Thank you!
Gelöst! Gehe zur Lösung
Gelöst von Redrunner92. Gehe zur Lösung
Make a custom project parameter and assign it to sheets, calling it something like "Discipline Number" and make it a Number parameter. Give this parameter the value "1" on all Architectural sheets, "2" on all Structural, and so on. Sort by Discipline Number first, then by Discipline, then by sheet number. Make the Discipline Number a hidden field. And it's done.