Doubled calculation on painting material take off for stairs stringer

0 ANTWORTEN 0
Antworten
Nachricht 1 von 1
anthony_iskandar
208 Aufrufe, 0 Antworten

Doubled calculation on painting material take off for stairs stringer

I painted "FW7" material on stairs stringer, and below can be seen that "Stringer" painting takeoff = 9.60m2 also calculated on "Cast-in-place Stair" painting takeoff = 9.60m2. And the total material takeoff, includes both of them instead on only one.

So we can't use the painting takeoff as-is? I should first deduct 9.60m2 from the Total to be the correct value.

Beside stairs, is there any element that I should be careful of?

anthony_iskandar_0-1636620489448.png

anthony_iskandar_0-1636621313992.png

 

 

0 ANTWORTEN 0

Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.

In Foren veröffentlichen  

Autodesk Design & Make Report