I need to make a door schedule for a multi family project. How do i make the schedule look like this? instead of listing every single door of all units, as all the units are typical, how can i make the schedule look like this.
here's how the typical units look like. so i want the door schedule saying XXXA/A , instead of all of the 109A/A , 110A/a ,,,,doors
here
Gelöst! Gehe zur Lösung
Gelöst von lucdoucet_msdl. Gehe zur Lösung
Create a Shared or Project parameter called something like TYPE DOOR NUMBER and assign it to your projects door families. Then replace the door number column with this new parameter with the XXX/a formated code, set the door number to be hidden and filter using the door numbers to show only one unit of each type.
-luc
Hi. I created the shared parameter but don't know how to replace the door number column with the shared parameter? Can you tell me how to do the next steps?
Thank you so much
Hi. I created the shared parameter but don't know how to replace the door number column with the shared parameter?
You won't be necessarily replacing the column, rather:
To achieve this,
Good luck,
-luc
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.