I am currently working on a project with two design options which each require their own Room Schedule however, despite the guidance, in the help menus, it does not appear to be as an Option View which can be controlled by the Design Options tab of the Visibility/Graphics dialog of the view since when viewing such with a schedule the 'Design Option' drop down is set to Automatic and cannot be changed. Am I doing something wrong?
Gelöst! Gehe zur Lösung
Are you saying that you cannot change Auto to the DO you want to schedule under the VG Overrides in the schedule itself?
...if this is the case, you might check your Phase Settings in the Schedule. Rooms are "Phase-able".
You hit the nail on the head, thank you. I was using a view template!
Thanks for responding but see my response to mpwuzhere above
Thanks again but no, I could not do it. But see the reply from mpwuzhere who got it right, I was using a view template.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.