I have doors in a curtain wall system, and those doors are not associated with a level when scheduled.
I've read a few things about this - understanding that the door will be associated with the level of the curtain wall (which is logical) and that doors that are technically on different levels will be assigned the same level. Here's my problem: I have 3 doors lined up on a curtain wall, the base constraint of that curtain wall is the first floor. 2 of the doors are scheduling fine, on the correct level, 1 does not have a level at all. All 3 doors were created at the same time, using the same method. So, why, still, are my curtain wall doors not scheduling properly.
I also have another curtain wall where non of the doors has levels assigned, but I'm hoping it's the same issue, and resolving one may fix the other...
Thoughts? Thanks in advance.