Create Column Schedule Level wise

Create Column Schedule Level wise

Anonymous
Not applicable
882 Views
3 Replies
Message 1 of 4

Create Column Schedule Level wise

Anonymous
Not applicable

Hello,

In scheduling of Column Material Takeoff, I would like to show the client how much material goes between different levels in the same column - that is material volume and estimated reinforcement Volume. It's ok even if I have to break the schedule level-wise, probably with filters. What's the most efficient way you would suggest?

ScheduleColumnMatlTakeOffLvl-wise.JPG

0 Likes
Accepted solutions (1)
883 Views
3 Replies
Replies (3)
Message 2 of 4

ToanDN
Consultant
Consultant
Create Parts from columns, split Parts by levels, and schedule Parts.
0 Likes
Message 3 of 4

ToanDN
Consultant
Consultant
Accepted solution
Or, create column material schedule and add Calculated parameter to calculate the volume based on level height (manually entered to the formula). Duplicated the schedule for other levels and change the formula accordingly.
Message 4 of 4

Anonymous
Not applicable

Dear @ToanDN,

Impressive thought as always 🙂

Volume based on level heights entered manually works really well. Saves a good time.

0 Likes