I am trying to create a finish schedule that can look like the attached setup on a sheet, but will be smart enough to accept the information and transfer to a secondary sheet that we print 8.5x11. I am not quite sure the best way to do this without having to type simple text twice or copy and paste over and over every time there is a change. The setup is a requirement that I can't get around or I most definitely would.
I am trying to create a finish schedule that can look like the attached setup on a sheet, but will be smart enough to accept the information and transfer to a secondary sheet that we print 8.5x11. I am not quite sure the best way to do this without having to type simple text twice or copy and paste over and over every time there is a change. The setup is a requirement that I can't get around or I most definitely would.
Make each a detail group and paste on the other sheet. Update one group instance and all the copies get updated.
Hi @Anonymous ,
Check this it might helps ![]()
https://forums.autodesk.com/t5/revit-architecture-forum/create-a-unique-smart-finish-schedule/td-p/8578378
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.