Hello, Have the problem with corrispond the level of the stairs from 1 2 second.
If click on command in floor plant, can intersect the 2 level for continuity.
How I have to do?
Thank's
Gelöst! Gehe zur Lösung
Gelöst von PijPiwo. Gehe zur Lösung
I'm not too sure what you are asking for. A problem that I do see is in the 2nd stair. You have the base at Level 2, and the top also at Level 2. You will need to create Level 3 to associate the top of the stair with.
On the Architecture tab look for
Alternatively (and this is my favorite way) go to an Elevation view, click and drag the line for Level 2 while holding down the control key. This will copy Level 2 and you can move it to whichever height you wish.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.