Message 1 of 4
Copying Areas to Multiple Levels and having the Reference Number Change per Flr

Not applicable
08-13-2019
11:25 AM
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
New to area plans - and we are using area plans to manage the areas of units in a multi-level housing project.
I have created the areas for the first level, which includes the Unit Name and Number. Then I copy the Area Boundary, Areas and the Area Tags to the 4 levels above ...
I had hoped that the numbers assigned to each area would have:
1) the first digit to change to correspond to the level number ..
2) or at least remain the same number as it was defined on the first level ...
Instead it appears that the numbering followed numerically from the last number that was defined.
Now I am expecting to much for the these tags ... or do I need to look into a tag that would be two parts ... Level + Position ...