Copying an element while keeping it's elevation relative to new level

Copying an element while keeping it's elevation relative to new level

danezeq
Collaborator Collaborator
2,124 Views
9 Replies
Message 1 of 10

Copying an element while keeping it's elevation relative to new level

danezeq
Collaborator
Collaborator

Hello people.

I'm trying to copy an element from level to level while keeping it's elevation relative to new level, but Revit insist keeping the reported level on the same level it was copied from?

Not so simple to understand? i've made a screencast:

https://www.youtube.com/watch?v=rd-yGMl9C08

0 Likes
2,125 Views
9 Replies
Replies (9)
Message 2 of 10

L.Maas
Mentor
Mentor

It seems you try to copy a hosted element and you try to copy it without the hosting element. That might give some issues with finding the right elevation.

 

And indeed hosted elements have the Schedule Level parameter (instead of the Level parameter like other elements).

As this is just a schedule parameter, Revit decides not to change that during copying (because you are creating a copy). So this is by design.

This means you will have to adjust the value(s) afterwards if important to you.

Also see THIS page.

 

Louis

EESignature

Please mention Revit version, especially when uploading Revit files.

0 Likes
Message 3 of 10

s.borello
Advisor
Advisor

Use create similar. 

0 Likes
Message 4 of 10

danezeq
Collaborator
Collaborator

Thanks. this link leavers me with no solution. right?

0 Likes
Message 5 of 10

danezeq
Collaborator
Collaborator

Create similair mean i'll create similiar one by one.

So there is no way to create all of them in another floor?

0 Likes
Message 6 of 10

L.Maas
Mentor
Mentor

No, it mentions that not changing the Schedule Level parameter is by design.

 

And your issues are one of the reason I tend to limit the use of hosted elements. In most cases I only use hosted elements on elements that I am in control of (e.g powersocket on cable trunking). This means in most cases when copying I will copy the host and the hosted elements together. In many cases I use just unhosted elements.

Of course some elements needs hosts (e.g windows and doors)

Louis

EESignature

Please mention Revit version, especially when uploading Revit files.

Message 7 of 10

danezeq
Collaborator
Collaborator

I see. thank for explanations.

0 Likes
Message 8 of 10

JonesMartyn103
Observer
Observer

You could also create a section view to see all the elements you have copied and select them and change the Schedule Level and any other level realated parameters you may have creared

0 Likes
Message 9 of 10

alaa_osama
Explorer
Explorer

Thank you very much for this Note

(e.g powersocket on cable trunking). This means in most cases when copying I will copy the host and the hosted elements together. In many cases I use just unhosted elements.

 

0 Likes
Message 10 of 10

TripleM-Dev.net
Advisor
Advisor

Could be a couple of things...

 

First, the original element is hosted to a element in a link, a similar host may not be found when pasting. (could depend on linked model).

 

Second, the "Schedule Level" parameter, is that actually the builtin one, because it's under "Other" and not under "Constraints". In default Specialty equiment that parameter doesn't exist, a generic model family converted to that category does but is often locked out depending it's host behaviour.

So maybe just text in a user created parameter is being copied?

 

Maybe share that family?

- Michel

 

ps. Revit 2019? (was Schedule Level even introduced in that version?)

Darn, just notice it's a old post.

 

@TripleM-Dev.net -this post has been edited due to Community Rules & Etiquette violation.

0 Likes