Hello Experts,
I'm having a small problem, when I try to Copy/Paste a 3D-model from one file to another..
In the first (orignal model) the foundation is in Level (00) Foundation. (My language; "Fundament").
But... When I try to Copy the model to another file, the foundation-part ends up in Level (01) Main areaplan (In the picture; "Stueplan").
I have tried to convert the entire model into a Group, and then change the level. It works (almost), except that the windows and doors still connects with the wrong Level.... What to do?
I have attached a picture.
Regards
Morten
If you link in the other model, does it come in at the correct level/elevation or can you move it to the desired location? If so, have you tried linking it in and then and then binding it?
Thanks for the reply.
Actually I have tried to link the model, but I found it much easyer, just to use Copy/Paste instead.
But I think I found the solution myself, just by using "Paste - Aligned To Picked Level".
Now it works!
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.