Hi, I have a model with a linked architecture file. I have created a planed view but realized I draw a plane in the Structural plane and I want to copy it to the Floor plane. Is there a way to do it? I have attached a PS
Thanks in advance .
Do you mean that you copied a Link Level to your Project and created a Plan View for that copied Level, and then placed a bunch of stuff on that Level?
exactly what you wrote. Now I want to take all this bunch of things and copy them exactly to the "FLOOR" plane.
Thank you
@yu85.info wrote:exactly what you wrote. Now I want to take all this bunch of things and copy them exactly to the "FLOOR" plane.
Thank you
Dang! So, you want to move everything from that Level to another Level. Depends on the elements. Changing Host Level(s) through Element Properties is one way. Clipboard Cut/Paste between Levels is another. I could go on, but suffice to say, it depends. I would probably delete the level and inspect what warnings that get thrown to see exactly what issues I need to mitigate. Then undo delete - or leave it deleted - and move forward with the needed "clean-up" work.
Thank you but I do not want to copy from one level to another. In the same level I wish to copy from the Structural plane to the Floor plan. Like in the PS attached.
You can't.
BTW: this is not what I described initially and what you confirmed.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.