Hello all,
My previous colleague had assigned a shared parameter (text) to all the elements in the project in order to indicate the construction phase of each element.
I want to make some export in Navisworks for each phase.
1. How can I check which element dont have yet the phase information?
2. How can I control the visibility of the elements deepening on the phase information that is assigned to them?
Thank you in advance!
Gelöst! Gehe zur Lösung
Gelöst von barthbradley. Gehe zur Lösung
Revit already assigns elements a Phase. Phase and Phase Demolished. What does your Text Parameter do that they don't do?
...in fact, there is a whole bunch of intelligence built into Revit for Phasing.
We have already use this, for new construction / demolished and temporary elements.
The information that we assigned with the phase parameter is if it will be Phase A,B,C etc
Huh? Are these like sub-phases or something? Nevertheless, rule-based filters are super easy to set up. Where are you struggling exactly?
Yes we have some sub-phases. You are right, I need to use filters for this job..I didn't had it in mind.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.