Hello,
For the project I am working on, we are building an addition onto an existing building. Our HVAC model has the heat pumps being demo'd in "New Construction", but it isn't showing as demolished in New Construction. Is there a way to link/connect the HVAC model's phasing with the ARCH model phasing so that the heat pumps show as being demolished and not visible in new work?
Gelöst! Gehe zur Lösung
Gelöst von ToanDN. Gehe zur Lösung
Thanks, I couldn't remember that function! Unfortunately, the phases are mapped properly, and we have the proper phase filter on (Previous + New), do you know what else it could be?
The Phase Filters in each model must match exactly. For example, if your model's view is using a Phase Filter called "Previous + New" then their model must have a Phase Filter named exactly the same "Previous + New". If the Phase Filter don't match, you can add one to your model that does match theirs so your view(s) can use the matching Phase Filter.
Steve Stafford
Did you find this post helpful? Feel free to Like this post.
Did your question get successfully answered? Then click on the ACCEPT SOLUTION button.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.