Dear Experts,
I am new in Revit. So, I am preparing a set of initials plans for a defined product. So, one of them is the RCP, I had drafted the ceiling tiles but I can not see them and I think that views are properly set. On Ceiling plans level 1 and 2 is not see. I now that is there, because, I tried to overlay another ceiling gave me the double-counting message.
verify material of ceiling has pattern
verify height of ceiling is set to proper height desired
verify view range and cut plan is set to proper height
Dzan Ta, AEE, ASM, ACI.
Win 11 Pro/DELL XPS 15 9510/i9 3.2GHz/32GB RAM/Nvidia RTX 3050Ti/1TB PCIe SSD/4K 15.4" Non-Touch Display
what are you using as a ceiling material?
when you say Drafted do you mean actually drawn the lines?
use the ceiling tool and select the Sketch Ceiling tool draw you outline then assign the correct material
then confirm your visibility settings are correct, make sure VISIBLE is checked
as @dzanta recommended check your View Range
Thanks a lot for your reply!
I mean when I write drafted I placed the ceiling but now I can not see it!
I had checked and is set as your picture attached
@Anonymous
It could be the view template … try the following:
YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION
Thanks a lot!
I do not know if I can do this because is a shared file it is in a central location and it is input for other Architects.
Maybe have your company bim manager look at it then. But you wouldn't/shouldn't overwrite existing templates in the shared project, and actually just add that one to it, you could probably remove all other templates in the temporary file to just transfer the one... give it a unique name... maybe check if your template type is set to ceiling aswell btw...
@Anonymous
Mate! you are just applying a new view template...that will neither kill your central model nor overwrite your current template. If it works then your initial view template has some setting which is messing up the view...you could then fix it or ask a more experienced user to fix it for you!
Trying is better than an endless guessing game
YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION
Dear Jedi, I did it and it works!
Another way that I was in mind was to copy as individual level 1 and phased in the correct and renamed as RCP. What do you think about it? well in my case it is in level one of the building the ceiling... ![]()
@Anonymous
I say that you are the only one among us who can see what is on your screen and if you say it works and that you are happy, then we are all happy for you too ![]()
YOUTUBE | BIM | COMPUTATIONAL DESIGN | PARAMETRIC DESIGN | GENERATIVE DESIGN | VISUAL PROGRAMMING
If you find this reply helpful kindly hit the LIKE BUTTON and if applicable please ACCEPT AS SOLUTION
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.