We're doing BIM coordination and received 2 architectural models and 1 structural model that have different origin points, which is usually no problem. We've committed to using structural's 0,0 point, but no matter how I try to move the arch models they keep coming in at the same (wrong) point. I've tried moving the base point, the survey point, with and without the paperclip checked, and I've tried relocating project.
What's kind of worked is moving (well, copying, since it won't let me move) the entire building, but I lose a bunch of annotation and get lots of errors and warnings, so I'd prefer to not do it that way.
Any ideas on why this isn't working?