Message 1 of 5
Can revit put 2 parameters in one column in a schedule for a drawing list?
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
My workflow for sheet numbering is required by some cities.
I know about making the sheet number and putting it in a schedule. In the image I currently do it like for drawing E-103.00 and towards the end.
However, I need to have the last two digits to be a revision number. Like the first 3 drawings listed.
I need to have the top 3 drawings E-101.01 look like the E-103.00.
In other words, how do I get the (2) parameters in one column in a schedule.