Revit Architecture Forum
Welcome to Autodesk’s Revit Architecture Forums. Share your knowledge, ask questions, and explore popular Revit Architecture topics.
abbrechen
Suchergebnisse werden angezeigt für 
Anzeigen  nur  | Stattdessen suchen nach 
Meintest du: 

Calculated Values

5 ANTWORTEN 5
Antworten
Nachricht 1 von 6
MS_jkimc65
311 Aufrufe, 5 Antworten

Calculated Values

My office has upgraded Revit consistently every year.  We had some schedules that were pre Revit 2017 which didn't support calculated values in tags, I hope I said that right?  Anyhow, I am currently looking at revamping a Occupant Load Schedule and Room Tag in hopes to get occupant load shown on our plans.  My schedule seems to be working right, however, the Room Tag is where I am experiencing problems.  I have created a Key Schedule to auto-populate info in my Occupant Schedule based on the "Function of Space".  I have added a parameter with a formula to calculate the "# of Occ".  Everything in my schedule seems to be working.  Once I modify my room tag to include the "# of Occ" I get a return of 0 (zero) once it is loaded into project.  I have included my sample file that I am testing this in.  If anyone has any suggestions on what I am doing wrong, I would appreciate a response.  THANKS IN ADVANCED!

j. kim candelario
method-studio, inc.
5 ANTWORTEN 5
Nachricht 2 von 6
MS_jkimc65
als Antwort auf: MS_jkimc65

I forgot to mention this was done in Revit 2018.

j. kim candelario
method-studio, inc.
Nachricht 3 von 6
ToanDN
als Antwort auf: MS_jkimc65

Your Net Room Area column shows nothing so obviously the formula returns nothing.

 

Capture.PNG

Nachricht 4 von 6
barthbradley
als Antwort auf: MS_jkimc65

Something is wacky with "Occ Load Fixed" in your formula "if(Area Per Occupant > 0 SF, (round(Area / Area Per Occupant)), Occ Load Fixed)". It not pulling"Occ Load Fixed" information from  in your Project's Rooms. I suspect the Tag and the Room are referencing 2 different Shared Parameters with the same name.  I got it to work with one of my SPs just fine.  

 

...Oh, I also had to add my own SP to the Tag and the Project Rooms for "Area Per Occupant".  Yeah, I think the Shared Parameters you have in the Tag and Project don't share the same GUIDs.   It's working for me when I add my SPs.  

Nachricht 5 von 6
MS_jkimc65
als Antwort auf: ToanDN

ToanDN,
There were two schedules in this sample project, the correct one is the MS - Occupant Schedule which returns the correct "# of Occ" within the schedule, the issue is in the room tag. In this case I saw a video that indicated to either create a parameter or use a shared parameter which is supposed to be "# of Occ" and the formula is to be the same as I set in the schedule itself. I have included the video link below.
https://www.youtube.com/watch?v=P253SSMT2wE


kim candelario,
sr. associate + sr. bim manager

method studio10
360 west aspen avenue | salt lake city, ut 84101
801.718.1527 m
801.532.4422 o

www.method-studio.com

celebrating ten years of excellence
winner best of state | utah 2018
[http://method-studio.com/wp-content/uploads/2018/05/BestOfState_40x40.jpg]
j. kim candelario
method-studio, inc.
Nachricht 6 von 6
barthbradley
als Antwort auf: MS_jkimc65

You didn't figure it out yet? I tested and provided analysis is post 4/5.  I got it to work. You could not? 

Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.

In Foren veröffentlichen  