Hi,
I am having an issue and was wondering if you can help. (In Revit) We are digging in an existing sloped topography (which we created from surveyor's information) for a new construction, we then created a building pad, and then started to modify "dig" around our new building to uncover windos and balconies.
Now we want to calculate the average grade to know how much further we can dig around the building.
My cut/fill numbers of the building pad in the schedule won't change whenever I modify my topography in new phase, I've tried everything i can think of. It stays at near 110 617CF no matter what. I have a very pretty complex and sloped topography with three split surfaces, and the building pad is 10 feet around my building with an offset of 10". I have done what is described in this conversation (Put the topography to existing, and created a graded one in the new phase). Basically we just want to know the average grade line of what we're digging for the project, but whenever I lower or raise my topography "points" around my building, the Numbers of the pad don't change in the Schedule for our calculations. What am I doing wrong?
Thank you