Hello,
i would to ask if there is the possibility to use attached "top/base" with the roof instead of modify perimeter.
If the solution is to detach the wall to floor 1 clicking on it then I can't select the floor.
.rvt attached
Thank's
Gelöst! Gehe zur Lösung
Gelöst von ToanDN. Gehe zur Lösung
I have to attach the wall both pavement and for roof?
I have unlock the pavement.
Can you do a screencast with .rvt attached in this message?
Thank's
See screencast in a few minutes. Revised file attached.
https://knowledge.autodesk.com/community/screencast/fcc52726-6fcc-4ec0-af33-d16bbf81d843
I am a bit confused. I thought the same issue was resolved on the other identical thread.
Sie finden nicht, was Sie suchen? Fragen Sie die Community oder teilen Sie Ihr Wissen mit anderen.