Hello every one.
I've been triying to make an schedulle but been unable to make like the reference in the atached file.
- i can make an schedulle for all the gross area building by floor and gran totals.
- can make a single schedulle fir the property line area.
but been unable to mix them and include all the data showed in the image (made it in excell and manually upadate every time it's get changed).
my knowledge in dynamo its limited so, i do not know if taking that path would resolve my question.
thanks in advance for taking the time.
Oscar.