A problem in Schedule of linked file elements
- Mark as New
- Bookmark
- Subscribe
- Mute
- Subscribe to RSS Feed
- Permalink
- Report
Hi everyone,
I am having a project of twin villa, simply it is one building and its mirror.
So i modeled the villa in a file, and then prepared a master plan which contains a link from the villa file, then i mirrored the link.
Now, the master plan file is having 2 links of the same model, but one is mirrored.
In the doors schedule, you can add a field of the link, but i need to add some parameters to the link to be used in the door schedule.
I created a shared parameter called (link is mirrored), (yes/no), because i need to make a formula in the door schedule using this bool value.
But, after adding the shared parameter to the project, in RVT LINKS category, it does appeares when i select the link, and i did entered the value, and i added this field in the schedule successfully but in the end, the schedule does not read the value i am giving to the link.
The schedule can read properly the link name, but never reades an additional parameter i add.
I hope that i explained the problem clearly, i know it may be complecated. So many thanks in advance for any helping attempts.