I've read a few posts over the past couple of days and nothing that I can find that would work.
I have a revision (tracking) schedule created. Got it working until I add a second revision to a sheet and its listed under 'current revision'. is there a way to show a sheet under each revision?
i.e. sheet A1 was revised 6/1/18 under Rev1 with a few other sheets. Then when Rev2 is created, the A1 sheet moves from Rev1 list to Rev2 list.
There a way to have A1 show up under both/all revisions?
feels like its a parameter or something that I am missing.
ALSO - is there a way to add 'comments' to the revision could and have it added to the revision schedule?
Rev2015:
if I add a Rev2 to A503 (below), A503 will move from Rev1 to Rev2. want to show it in both Revisions.