I have a hanger family (Pipe Accessory Family). The family adds rods (pipe accessory family) (visible) as the strut increases. Each time a rod is added there is a point (generic family) that gets added (visible) to that rod. Everything works great. The issue is that I'm trying to schedule the points that get added and only have them populate the schedule as they become visible in the project. i.e. there is only rod 1, rod3 and rod 6. But, there is no rod 2, rod 4, rod 5. I can get a schedule to show all the points, but not just the points that are actually being used in the project. The kicker, I need to be able to change the point numbers in the schedule. That is my main concern. Because I kick that schedule out to excel, number the points and bring them back into the project. Any ideas?
Thanks.