Hello
I run a Fill+Pack analyses in MD and DD and 3D mesh type.Material is Hostaform ,Ticona ,c9021.this box has a thin section of 0.4 mm .The general thickness is 1.4 mm.In MD and DD I have short shot but in 3D I don’t.
In molding window ,there is no evidence that part would be faced fill problem and everything is OK and the recommended parameters are :
Recommended Mold Temperature : 92.78 C,
Recommended Melt Temperature : 193.33 C
Recommended Injection Time : 1.0516 s
But in fill+Pack they are not suitable.
I increased the mold and melt temperature up to maximum , based on data sheet
Mold temperature range to analyze
from mold temperature = 75.0 C
to mold temperature = 95.0 C
Melt temperature range to analyze
from melt temperature = 180.0 C
to melt temperature = 200.0 C
and I decrease the fill time down to 0.85 s , the problem solved.
But the temperatures are maximum .instead of it I used molding window recommendations and decreased the gate diameter to increase shear heat ,instead of rising melt and mold temperatures , but it was not useful.
The question is , why 3d doesn’t have any problem by molding window parameters but DD and MD have?
Does the part will be filled in real injection cycle or not?
Thank you