Hi,
For Revit Lighting analysis, the LEED v4 EQc7 opt 2 preset mentions that it will analyse based on equinoxs 9/21 and 3/21.

However, after the analysis, the schedule generated only mentions 9/21, but no mention of 3/21.

Does the analysis actually include 3/21, but not stated in the table, or 3/21 simulation not included?
Thank you for any explainations/ clarifications.